• Fujairah Airport Tunnel Project (Phase 1 and 2)
    Year: 2020 – 2021 (Completed)Client: Emiri CourtLocation: Fujairah – UAEDescription: The airport tunnel is approximately 540 m in length from the north ramp to the south ramp and accommodates dual lanes each way. The Phase 1 and 2 Scope of Works is to carry out civil works for the construction of approximately 500.02 m of tunnel length and includes…
  • Fujairah Airport Tunnel Project (Phase 3)
    Year: 2023 – on goingClient: Department of Public Works and AgricultureLocation: Fujairah – UAEDescription: Construction, Completion, Maintenance and Guarantee of Fujairah Airport Tunnel Phase 3 works in 2 parts: 1st is at the North and South end and between Merashid-Rughaylat road junction, continuing South through FIA tunnel up to Fujairah-Sharjah border and extending further towards east up to Abattoir…
  • Construction of 33 Access Bridges to FOIZ Oil Terminals
    Year: 2022 – on goingClient: Fujairah Oil Industry Zone (FOIZ)Location: Fujairah – UAEDescription: The area north of the Port of Fujairah is a designated zone for accommodating Oil Storage Terminals. This area, further referred to as Fujairah Oil Industrial Zone (FOIZ), is subject to rapid expansion due to the increasing demand for oil storage capacity in recent years. The…